corporate workplaceUSA

US CORPORATE
BUILDING

Project Data

LocationUSA
Built Area150,000 sq ft
SectorCorporate Building
ClientConfidential

Key Outcomes

  • Delivered 150,000 sq ft of secure corporate workspace for a major US defence organization
  • Embedded security infrastructure across all zones without compromising workspace quality
  • Coordinated MEP and IT infrastructure for high-density engineering floor operations
  • Achieved full compliance with classified space requirements throughout the programme

A high-security corporate building fitout for a major defence organization, integrating classified workspace environments, open-plan engineering floors, and secure collaboration zones across 150,000 square feet.

This large-scale corporate building project involved the comprehensive design of interior environments for a leading defence and aerospace organization. The project demanded an architecture robust enough to accommodate classified operations, high-occupancy engineering floors, and formal collaboration zones all within a security-cleared, code-compliant framework.

Every spatial zone was developed with security protocol compliance embedded from concept stage, ensuring that access control, visual sightlines, and physical separation requirements were met without compromising the quality of the working environment.

The scale and complexity of the project required close coordination between interior architecture, MEP engineering, IT infrastructure, and the client's security teams throughout all phases of delivery.

Technical Documentation & Gallery

Engineering Workspace Floor
Engineering Workspace Floor
Collaboration Zone
Collaboration Zone
Conference & Briefing Suite
Conference & Briefing Suite
Open Plan Office Environment
Open Plan Office Environment
Secure Corridor Articulation
Secure Corridor Articulation
Technical Support Zone
Technical Support Zone
Secure Operation Center
Secure Operation Center
Focused Work Enclave
Focused Work Enclave
Collaborative Breakout Space
Collaborative Breakout Space
High-Security Corridor
High-Security Corridor
Executive Engagement Suite
Executive Engagement Suite
Staff Interaction Hub
Staff Interaction Hub
Infrastructure Adjacency Zone
Infrastructure Adjacency Zone
Code-Compliant Secure Facility
Code-Compliant Secure Facility
Modular Operational Environment
Modular Operational Environment